Draw and Plan
Get Free Quote
⭐ Rated 4.9 on Google · Since 2014 · 1,000+ projects completed

Planning Drawings London from £1,250 + VAT

If you’re planning a house extension, loft conversion, garage conversion or home alteration, you’ll normally need professional planning drawings before you can submit a planning application. Draw & Plan prepares accurate planning drawings for homeowners across London, including measured surveys, existing and proposed plans, site plans and planning application submission.

Our fixed-fee planning drawings London service starts from £1,250 + VAT and includes the information your local planning authority needs to assess the proposal’s design, scale, appearance and impact.

★ 4.9107 Google reviews
Read LinkedIn recommendations
Get your fixed fee quote within 24 hours

Application design information

What Are Planning Drawings?

Planning drawings are architectural illustrations that show how a property looks now and how it will change. They are developed from an accurate Measured Building Survey and form the visual evidence used by the local authority to assess an application. Our architectural design service develops the proposal and coordinates the submission.

Different purposes

Planning Drawings vs Building Regulations Drawings

Planning drawings show what a project will look like and how it relates to its surroundings. Building Regulations drawings explain how the approved design will be constructed safely and to the required technical standards.

Planning application package

What Do Planning Drawings Include?

A coordinated, fixed-fee package prepared for your local planning authority.

  • 3D laser-measured survey
  • Location and site plans
  • Existing and proposed floor plans
  • Existing and proposed elevations
  • Sections and roof plans where required
  • Planning application preparation and submission
  • Ongoing council liaison and drawing revisions
Request a quote

Fixed-fee service

How Much Do Planning Drawings Cost?

Our planning drawing service starts from £1,250 + VAT. A combined planning and Building Regulations package starts from £1,650 + VAT. The fixed fee is confirmed before work begins; see Services & Prices for the full inclusions.

A complete application service

  • Measured survey included
  • Application prepared and submitted
  • Council liaison and revisions

When they’re required

Do I Need Planning Drawings?

You will normally need drawings if your project requires planning permission, a Lawful Development Certificate or prior approval.

  • House extensions outside Permitted Development limits
  • Loft conversions or roof alterations requiring permission
  • Garage conversions and significant external alterations
  • New dwellings and outbuildings
  • Changes of use and flat conversions
  • Lawful Development Certificate and prior approval applications

Residential projects

Planning Drawings for Extensions

Our House Extension Drawings show the existing house, proposed floor layouts, elevations, sections and the extension’s relationship to boundaries and neighbouring properties.

Planning Drawings for Loft Conversions

Our Loft Conversion Drawings coordinate the proposed loft layout, roof plan, elevations and section so the authority can assess roof form, height, dormers and openings.

Application routes

Planning permission or confirmation of lawful development

Route 1

Planning Application

Used where planning permission is required. The authority assesses the proposal against planning policy and its effect on the property, neighbours and surrounding area.

Route 2

Lawful Development Certificate

Used to obtain formal confirmation that proposed work is lawful under Permitted Development rights, provided every relevant limit and condition is met.

Planning considerations

What the drawings help the council assess

01 Scale, height and massing
02 Layout and relationship to boundaries
03 External appearance and materials
04 Neighbour privacy and overlooking
05 Daylight and overshadowing
06 Street scene and local character
07 Access, parking and servicing
08 Local planning policy

From survey to submission

The planning drawings process

A clear process keeps the design, drawings and application information aligned. We begin by reviewing the property and your brief, then develop the proposal from an accurate survey before preparing and managing the planning submission.

  1. 01

    Project review

    We review your brief, property and likely planning route before confirming a fixed fee.

  2. 02

    Measured survey

    A 3D laser-measured survey records the existing building accurately.

  3. 03

    Design development

    We prepare and discuss the proposed layouts, elevations, roof plans and sections.

  4. 04

    Planning checks

    The proposal is checked against relevant planning constraints and application requirements.

  5. 05

    Application submission

    We prepare the application documents and submit them to the local planning authority.

  6. 06

    Council liaison

    We monitor the application, respond to queries and revise drawings where required.

Accurate existing information

Why measured surveys matter

Planning proposals are drawn over the existing building, so the accuracy of the survey affects every later drawing. A measured survey records the property’s dimensions, levels, openings, roof form and relationship to its boundaries. It gives us a reliable base for existing plans, proposed layouts, elevations and sections.

Consistent survey information also makes the changes easier for the planning officer to understand and reduces avoidable discrepancies between sheets. Read more about our Measured Building Surveys or start with Planning Drawings for Beginners.

Greater London coverage

Planning drawings across London

We prepare residential planning drawings across Greater London, including South London, North London, East London and West London. Every borough applies national planning rules alongside its own local plan, design guidance and site-specific constraints, so the property and proposal must be reviewed individually.

Our work covers house extensions, loft conversions, garage conversions, roof alterations, outbuildings, changes of use and other home alterations. See the full areas we cover or send us the postcode for a fixed-fee quotation.

Clear applications and next steps

Common planning drawing mistakes

Incomplete or inconsistent information can prevent validation, create questions or make the proposal harder to assess. Common problems include:

  • Submitting plans that are not drawn accurately or consistently
  • Omitting a required elevation, section, roof plan or site plan
  • Designing without checking local planning policy or property constraints
  • Showing unclear boundaries, access arrangements or neighbouring context
  • Using different dimensions or details across the drawing set
  • Treating planning approval as permission to begin construction immediately

Planning permission guidance

Planning permission and Building Regulations are separate approvals. Planning considers whether the design is acceptable, while Building Regulations consider how the work will be constructed safely and perform properly.

Our Planning Permission Guide explains when each approval is needed. For technical drawing requirements, read the Building Regulations Guide and view our Building Regulations Drawings service.

What happens after approval?

Planning permission confirms that the proposal is acceptable in planning terms, but it is not normally the final step before construction. Check the decision notice carefully, including any conditions that must be discharged before work starts.

Most projects then require technical Building Regulations drawings and approval. Structural calculations, Party Wall notices or other specialist information may also be needed. Our guide to what happens after planning permission sets out the next stages.

Planning drawing samples

Existing and proposed drawing sets

Real residential planning drawings showing floor plans, elevations, sections, roof plans and site context. Select any drawing to view the full sheet, or browse our wider Drawing Samples collection.

34 Osterley Park View Road — loft conversion

2026

4 Noyna Road — house extension

2026
See past projects

Helpful answers

Frequently Asked Questions

Do I need planning drawings?

You will normally need planning drawings if your project requires planning permission, a Lawful Development Certificate or prior approval. Typical projects include extensions, loft conversions, roof alterations, outbuildings, new dwellings and changes of use.

How much do planning drawings cost?

Planning drawings start from £1,250 + VAT. Combined planning and Building Regulations packages start from £1,650 + VAT, with the fixed fee confirmed before work begins.

How long do planning drawings take?

Planning drawings are typically issued within seven days of the measured survey. Timing can vary with the project’s complexity and any specialist information required.

What’s included in planning drawings?

Our service includes a 3D laser-measured survey, location and site plans, existing and proposed floor plans and elevations, relevant sections and roof plans, application preparation and submission, council liaison and drawing revisions.

Can you submit the application?

Yes. Our planning drawings service includes application preparation and submission, ongoing council liaison and drawing revisions.

Do you cover all London boroughs?

We prepare planning drawings across Greater London, including South London, North London, East London and West London. Send us the property postcode and project details so we can review the site and confirm a fixed fee.

Do I need drawings for Permitted Development?

You may still need accurate existing and proposed drawings to confirm that the work stays within Permitted Development limits and to apply for a Lawful Development Certificate.

Are planning drawings the same as Building Regulations drawings?

No. Planning drawings focus on design, appearance and impact on the surrounding area. Building Regulations drawings provide the technical construction information needed to demonstrate compliance with safety and performance standards.

What happens after planning permission?

Check the decision notice and any conditions first. Most construction projects then need Building Regulations drawings and approval, and some also require structural calculations, a Party Wall process or other specialist information before work begins.

Do planning drawings guarantee approval?

No planning application can be guaranteed. Clear, accurate drawings help the local authority assess the proposal and reduce the risk of delays caused by missing or inconsistent information.

Ready to begin?

Get planning drawings from £1,250 + VAT.

Clear, fixed fees from an established drawing practice serving homeowners since 2014 and rated 4.9 on Google. Tell us about your project through our Contact page.

From £1,250 + VATFixed feesSince 2014★ 4.9 Google rating
Get your fixed fee quote within 24 hours